|
Table of Contents
Appendix A contains the following:
- A - 1 System Alternatives Analysis and Evaluation Report
Attachment A - Table of Alternatives
A - 2 Potential Goal 5 Impacts
A - 3 Non-Single Occupant Vehicle (SOV) Mode Share Targets:
Methodology, Strategy and Regional Transportation Plan
Provisions
Appendix B contains the following:
- B - 1 Roadway System Needs and Washington County 2020
Committed System Motor Vehicle Performance Deficiencies
Map
B - 2 Capacity Enhancement Projects and Washington County
Roadway Project Map
B - 3 Level of Service Description
B - 4 Transportation System Management Needs
B - 5 Existing Bridge Conditions Descriptions and Map
B - 6 1997 - 1999 Safety Priority Index System (SPIS) Map & List
B - 7 Pavement Condition by Functional Class
B - 8 Functional Class and Street Connectivity by Jurisdiction
Appendix C contains the following:
- C - 1 Transit Needs
C - 2 Pedestrian Network Needs Analysis
C - 3 Near-Term Infill Pedestrian Projects Map & List
C - 4 Far-Term Sidewalk Projects Provided in Conjunction with
Roadway Improvement Map & List
C - 5 Far-Term Infill Pedestrian Projects Map & List
C - 6 Pedestrian Crossing Improvement Study Areas Map
C - 7 Recommended Priority Pedestrian Crossing Study Areas
C - 8 Washington County Bicycle System Needs Analysis
Attachment A - Bicycle Facility Gap Analysis (series of 8
maps)
Attachment B - Urban/Rural Interim Bikeway
Improvement Rough Cost Estimates
Attachment C - Secondary Bicycle Routes (series of 4 maps)
Pedestrian Enhancements Design Guideline Booklet
C - 9 Through - Truck Routes
Attachment A - Truck Needs and Volumes Maps
Appendix D contains the following:
- D - 1 20 Year Maintenance and Operations Needs Projection
D - 2 Washington County Transportation Plan Update (TPU):
Committed Structure
D - 3 Urban Fringe Transportation Improvements - Travel Time
Analysis (OAR 660-012-035(10)-(12))
D - 4 Compliance with Transportation Planning Rule Provisions
(Section 045)
|