Current Projects

SW TAYLOR STREET (SW 90th Ave. to 9980 SW Taylor St.)

A neighborhood meeting was held October 21, 2009 to discuss the Neighborhood Streets Program, determine traffic related problems and propose solutions.

A second neighborhood meeting was held December 16, 2009.  A consensus was not reached at this meeting and it was decided to hold another meeting in the summer of 2010.

A third neighborhood meeting was held September 21, 2010.  A consensus was reached at this meeting and it was decided to vote on the installation of a speed display sign.  Over 67 percent of the ballots were returned with a "Yes" vote.  Sundown Electric completed installation of the speed display signs on May 31, 2011.



NW MILL CREEK DR (NW 137th Ave. to NW 139th Ave.)

This neighborhood voted on the installation of a speed display sign. Sundown Electric completed installation of the speed display signs on May 31, 2011.

 

SW 78TH AVENUE (SW Canyon Dr. to SW Fairway Dr.)


SW 178TH AVENUE (SW Alexander St. to SW Johnson St.)