209th Avenue Bridge over Butternut Creek

PROJECT PAGES

This project replaced the Butternut Creek Culvert under SW 209th Avenue with a new bridge structure. The new bridge was raised five feet above the existing road elevation.

The new bridge accommodates two through lanes, a center left turn lane, bike lanes, and sidewalks. Retaining walls were constructed to minimize property and environmental impacts, as well as grading, drainage, paving, guardrails, signing and striping.

Related Media Releases:
County to close 209th summer 2009