229th Ave Bridge over Butternut Creek
This project will replace the existing bridge with a new concrete bridge structure. The new bridge will have two 12 foot wide travel lanes with shoulders. Environmental issues will need further review.
Project Contact
Joe YounkinsPrincipal Engineer
(503) 846-7832
Email: Joe Younkins
