Greener Rd. Bridge
This project is located off of Fern Flat Road and replaces the existing bridge over Dairy Creek with a single-span structure that is 82-feet long and 36-feet wide out-to-out. The project included minor roadway shoulder widening to match the wider bridge section. The new structure consists of two 12-foot wide travel lanes, with 4.5 foot shoulders. Neither horizontal nor vertical roadway improvements are included in the project.
This project is complete.