Oleson Road Bridge over Fanno Creek

This project will improve Oleson Road between Dover Street and Beaverton-Hillsdale Highway, including replacement of the bridge at Fanno Creek.

Improvements include:
  • One travel lane in each direction with a center turn lane
  • Bike lanes and sidewalks on both sides of the road
  • Street lighting
  • Drainage facilities
  • Landscaping
In coordination with Raleigh Water District, their existing waterline that falls within the project limits will be temporarily relocated by the bridge contractor and subsequently mounted under the new bridge. Waterline work will be funded by the water district.

Preliminary Design with aerial

Preliminary Design without aerial

This bridge replacement was designed by County engineering staff with consultant support by CH2M Hill for permitting and Geotechnical support.



Open House - November 7, 2012

 
The County held a project Open House at Montclair Elementary School to present design concept details. See links above for preliminary concepts.



Meet the Contractor Open House - July 8, 2014

Location: Raleigh Hills K-8 School cafeteria (5225 SW Scholls Ferry Road)

Time:
5 and 7 p.m.

Displays: