Saltzman Road (Bauer Woods to Cornell)
This project is divided into two phases.
Phase 1 is from NW Cornell Road to NW Bauer Woods Drive.
Phase 2 is from NW Bauer Woods Drive to NW Thompson Road.
At this time only Phase 1 is funded and is currently in construction.
(Phase 1) The project includes the design, right-of-way acquisition, and construction of a 3-lane roadway (one travel lane in each direction with a center turn lane), including sidewalks, and bike lanes. Other improvements include storm drainage, street lighting and utility upgrades. Also included are new traffic signals planned at NW Dogwood Street and at NW 128th Terrace.
For more information, visit consultant website here: http://www.deainc.com/saltzmanroad/.
Related Media Releases:
Meet contractor Open House
Project Contact
Matthew CostiganProject Manager
(503) 846-7825
Email: Matthew Costigan