This project realigned and relocated the intersection of Sellers Road with Banks Road 275 feet east of its current location. The relocation provided additional space for the Banks-Vernonia Linear Trail south trailhead and combined two railroad crossings (Sellers Rd and Banks Rd) into a single crossing (Banks Rd).  

Additional project improvements included

  • Widened travel lanes
  • Paved shoulders
  • Sidewalks
  • Street lighting
  • Storm drainage infrastructure
  • Water quality swale 
  • Signing and striping
  • Safety upgrades to the Banks Rd railroad crossing