Skip to main content

Comment on the Farmington and River Roads Intersection through Aug. 29

Comment on the proposed improvement design for the Farmington and River roads intersection at an online open house through Aug. 29.
Media release

For Immediate Release: Friday, August 13, 2021

Sponsored by: Department of Land Use and Transportation

 

Click or tap to enlarge

Comment on the proposed improvement design for the Farmington and River roads intersection at an online open house through Aug. 29.

This intersection of two heavily traveled roads is currently controlled with stop signs. Travelers experience long waits during peak commuting times.

An off-center roundabout, southwest of the current intersection, was selected based on results from a traffic study and public comments received during the 2020 online open house.

Visit the Farmington and River Roads Intersection Open House to learn more, leave comments or ask questions. Contact Capital Project Services at 503-846-7800 or [email protected] for more information.

Washington County is committed to planning, building and maintaining a great transportation system, ensuring the safety of all roadway users, and operating the County roadway system in cost-effective and environmentally responsible manner.

Media Contact:

Cindy Remy, Senior Communication Specialist/PIO
503-846-7696
[email protected]
Back to top