175th Avenue/Kemmer Road Intersection

Project Description

The 175th Avenue and Kemmer Road intersection experienced inefficiencies in traffic flow at peak travel times due to a four-way stop configuration. Traffic volumes at the intersection are projected to increase with anticipated growth in the area, which warranted improvements that will better handle existing and future volumes, resulting in improved traffic flow.


Several concepts were analyzed during the preliminary design phase. With input from the public, a roundabout was selected for construction.


Funding Information

This $5 million project is funded through the MSTIP Bonding Cost-sharing program. The total project cost includes the estimated cost of design, right-of-way and construction and is subject to change.