Project Description

The Butner Road culvert at Johnson Creek will be replaced with an updated culvert. Sidewalks and bike lanes will be added on both sides of the road, along with appropriate railings.

The existing culvert on SW Butner Road at Johnson Creek, between SW 126th and SW Huntington avenues, is in poor condition. A wooden pedestrian bridge next to the road will be removed.

SW Butner Road will be closed for about six weeks while the culvert is replaced with access maintained for bikes and pedestrians. Detour

 

Sign up to receive periodic project updates

 

Learn about the Tualatin Watershed Enhancement Collaborative (TWEC).

 


Funding Information

This project is funded through the Road Fund as part of the Annual Maintenance Plan.

 