Taylors Ferry Road and 80th Avenue

Project Description

This project includes:

  • Bridge replacement on Taylors Ferry Road at 80th Avenue.
  • Culvert replacement on 80th Avenue, north of Florence Lane.
  • Sidewalk installation on Taylors Ferry Road, between Washington Drive and 78th Place.

 

The Taylors Ferry Road bridge at 80th Avenue is older and no longer meets design standards. It has been damaged by vehicle crashes and flooding. The bridge will be replaced with a box culvert.

The culvert on 80th Avenue, just north of Florence Lane, is in poor maintenance condition and will be replaced with a box culvert.

A closure of Taylors Ferry Road and 80th Avenue is anticipated during culvert installation at the two sites.

A pedestrian pathway will also be constructed on the north side of Taylors Ferry Road, between Washington Drive and 78th Place, as an URMD Pedestrian and Biking Safety Improvement Project.


 

Project Funding

This estimated $1.1 million bridge project is funded through the County's Road Capital Bridge Fund. The $600,000 culvert project is funded through the County's Road Fund. The $854,000 sidewalk improvements are funded through the Urban Roads Maintenance District (URMD).

 

Community Participation Organizations CPO 3 and CPO 4M
Commissioner District 3

 