Walker Road (173rd to Schendel)
Meet the Contractor Open House #4 - May 24, 2016
- Postcard mailer
- Project aerial strip map
- Traffic display
- Fast Facts display
- Project schedule
- Retaining wall display
- Schedule of Walker area projects
- Walker Rd project area vicinity map
- May 24 Open house comments and summary
Open House #3 - May 19, 2015
- Postcard mailer
- Summary with comments
- Project fact sheet
- Design strip map - 173rd to Schendel (subject to change)
- Aerial map - 173rd to Schendel
- Typical roadway cross-section (subject to change)
- Traffic analysis boards
- Walker Road area projects vicinity map
- Walker Road area projects timeline (subject to change)
Open House #2 - January 23, 2014
- Postcard mailer
- Summary with comments
- Preliminary design strip map #1 (173rd to Delta) (subject to change)
- Preliminary design strip map #2 (Delta to 150th) (subject to change)
- Preliminary design strip map #3 (150th to Murray) (subject to change)
- Preliminary design strip map #4 158th (Schendel to Baseline) (subject to change)
- Project fact sheet
- Fast facts display
- Traffic analysis boards
- Average Daily Trips/PM Peak traffic counts
- Preliminary design proposed bike treatment concept (subject to change)
Open House # 1 - April 24, 2013
- Postcard mailer
- Open house summary
- Preliminary design strip map #1 - 173rd to 158th (subject to change)
- Preliminary design strip map #2 - 158th to Murray (subject to change)
- Project fact sheet
- Aerial map - 173rd to Schendel
- Aerial map - Schendel to 150th
- Aerial map - 150th to Murray
- Traffic analysis boards